If you go back and follow this OP they have been trying to receive P25 Signals for Trunking Systems over 50 miles from the OP to Tower Site with Beams Line and PREAMPS -35DB would be so high it would overload the Frontend of the Scanner so bad it would Desense the Scanner to the point of bad reception.