Reading the article that this will be a Astro25 system, is it going to be a P25 Phase II system. even when the first Statewide system came online for Florida it never really worked and it was horrible. my guess is it was never built right. hopefully the new system will be better.
The first generation SLERS that was Motorola was never completed state-wide. State Department of Management Services (DMS) dragged their feet with regards to the site development (tower construction, shelter and generator purchase & placement, etc.). ALL Motorola was responsible for was to bring in the RF equipment, plug it in, and optimize it when the site was completed. Also DMS did ALL of the RF engineering and site selection back in the 90's.
It anyone is to blame on the delays of the official first SLERS roll-out, that was the SmartZone 3600 baud with Omni-link, was the state.
The new P25 contract has Motorola, through a third party construction company, responsible for all the site development this time around.