Today Denver Public Safety EDACS had a complete outage from about 2:22 pm until 2:30 pm. It sounded like the EEB guys reset a multiplexer at Loretto Heights right before it happened.
No control channel could be heard during that time.
Then they switched dispatch consoles to the back up remote site (the ROC). And the system was up on Morrison.
They are still trying to figure out exactly what happened.
No control channel could be heard during that time.
Then they switched dispatch consoles to the back up remote site (the ROC). And the system was up on Morrison.
They are still trying to figure out exactly what happened.