Lancaster County - P25 System (Was OpenSky System Dumped)

Status
Not open for further replies.

lancopa

Member
Joined
Jan 24, 2012
Messages
65
I don't think anyone is testing anything yet. Lanco had the original contract amended to facilitate some technical changes.

Ahh ok. I know there is a meeting coming up at the training center to discuss the system and whatnot. I am curious to know how it's going.
 

dcr_inc

Feed Provider *York Pa.*
Premium Subscriber
Joined
Feb 28, 2005
Messages
1,032
Location
Delta, Pa
Has anything started on this project?.. I see they have 99 T-Band freqs licensed to them..
 

P25_GURU

Member
Joined
May 21, 2012
Messages
21
It appears that the T-Band sell out is going to fade away..But time will tell.. Lanco will still build out because of the promise of Free Relocation if and when T-band gets sold
 

dcr_inc

Feed Provider *York Pa.*
Premium Subscriber
Joined
Feb 28, 2005
Messages
1,032
Location
Delta, Pa
So my question still stands... Is anything happening on this project. Has the Bid been awarded and system design complete? .. Anything ??
 

mlmummert

Member
Joined
Feb 17, 2008
Messages
356
So my question still stands... Is anything happening on this project. Has the Bid been awarded and system design complete? .. Anything ??

Same questions from me. Lancaster County has been struggling with this radio project for years yet their systems remain in the dark ages.


Sent from my iPad using Tapatalk
 

lancopa

Member
Joined
Jan 24, 2012
Messages
65
Did anyone go to the council meeting last week that also had radio discussion? if so what did they say?
 

bauker

Member
Joined
Feb 16, 2006
Messages
58
Location
PA USA
Phase I not II

It is a standard P25 system, not Phase II, per existing plans. Also, the new radios in our fire apparatus, already installed mostly with grant funding, are Phase I units. The licensing allows several different emissions, including narrow analog, so we'll see how the channel plan is laid out when the time comes.
 

Thunderbolt

Global Database Administrator
Moderator
Joined
Dec 23, 2001
Messages
7,118
Location
Ann Arbor, Michigan
The sad part is that they will have to migrate to another frequency band, probably the 700/800 MHz area in the future. With the UHF-T band Giveback program taking effect in roughly eight years from now, they will have to implement a whole new radio system. If this holds true, this radio system will be retired ahead of projected obsolescence date.

73's

Ron
 

lancopa

Member
Joined
Jan 24, 2012
Messages
65
It is a standard P25 system, not Phase II, per existing plans. Also, the new radios in our fire apparatus, already installed mostly with grant funding, are Phase I units. The licensing allows several different emissions, including narrow analog, so we'll see how the channel plan is laid out when the time comes.

Is there a chance that before the system is completed it will indeed be Phase 2?
 

bauker

Member
Joined
Feb 16, 2006
Messages
58
Location
PA USA
I deal in facts, not speculation, so... This is a P25 phase 1 system to be compatible with multiple vendors (a good thing). Since phase 2 has limited vendor availability at this time, and prices are higher, the odds of going to phase 2 on this system at this time are almost zero.

As far as the future of T-band, yes, there are some questions about that, but no one can fully hazard what is going to occur. Technology is changing fast, new interoperability standards are being developed, and the next generation LTE stuff is being rolled out, so who knows.
 

vinzep491

Member
Joined
May 5, 2009
Messages
979
Looking at a county-compiled list of the radios suggested for use on the system, I do not see a single Phase Two model.
Given that Phase One radios are already being bought, as well...
 

lancopa

Member
Joined
Jan 24, 2012
Messages
65
Looking at a county-compiled list of the radios suggested for use on the system, I do not see a single Phase Two model.
Given that Phase One radios are already being bought, as well...

Exactly, and phase 1 radios cannot work on phase 2, correct? They would have to buy all new radios?


Has anyone gotten a complete straight answer about encryption? I don't understand the issue, either yes or no.

I would love to go to a meeting and ask. Depending on who you ask now, you can get nope, maybe, some, or yes.

It cannot be that hard at all. SERT team and so on. Ambulance for reports and that's it. Everything else should be completely open and scanable.
 

Ravenboy2003

Member
Joined
Sep 9, 2008
Messages
14
Exactly, and phase 1 radios cannot work on phase 2, correct? They would have to buy all new radios?


.

Most Phase 2 systems in place now are set up for mixed mode, meaning they are still using FDMA control channels. Phase 1 radios will work all day on a Phase 2 system, but will obviously degrade the system capacity by tying up an entire channel with 1 call whereas a Phase 2 radio would be talking in TDMA mode and allowing for a second call per channel.

Also most P25 radios on the street today that are Phase 1 can be upgraded to Phase 2 with a flash upgrade. A county like Lanco that is buying all new Phase 1 radios now will most likely just need the flash upgrade to do Phase 2. Just depends on the vendor and when they were manufactured.
 

dcr_inc

Feed Provider *York Pa.*
Premium Subscriber
Joined
Feb 28, 2005
Messages
1,032
Location
Delta, Pa
Any movement on this system??.. Towers, Radios, Fleetmap .. Any Thing !!!
 

lancopa

Member
Joined
Jan 24, 2012
Messages
65
So alot of departments are buying Phase 1/Phase 2 radios.

How long does the county plan on staying phase 1 if everyone out the door is getting phase 1/2 radios?
 
Status
Not open for further replies.
Top