VIPER P25 Phase II Migration
As Marshall mentions, there are no immediate plans to migrate the VIPER system to Phase II. Our current target for Phase I migration is 30 June 2014 and at least initially we will remain at FDMA. I anticipate that our controller firmware level will rise to include other features such as ISSI 8000 and CSSI with those being our emphasis in the near future. Factors that will drive a Phase II transition are magnified with a statewide/large user base system since a) greater than 50% of the subscribers need to be equipped with a TDMA capable device and b) the system base station architecture (GTR8000) must be in place to accomodate TDM operation. Given that initially we are simply converting the current Quantar bases to P25 Phase I operation, it is safe to say that for a complete, statewide P25 Phase II rollout, you have plenty of time to get ready.
M