Portsmouth VA P25 coming soon

Status
Not open for further replies.

LeSueurC

IBEW Local 50
Premium Subscriber
Joined
Nov 6, 2014
Messages
1,213
Location
James City Co, VA
Just the install left
 

Attachments

  • 6351E389-AEF3-4C4D-AEC0-A25D9757F450.jpeg
    6351E389-AEF3-4C4D-AEC0-A25D9757F450.jpeg
    74.7 KB · Views: 39
  • 64468A9B-13EF-4459-8F3B-276667287982.jpeg
    64468A9B-13EF-4459-8F3B-276667287982.jpeg
    157.2 KB · Views: 38

KevinC

Junior Radio Guru
Super Moderator
Joined
Jan 7, 2001
Messages
11,467
Location
Home
Just the install left

Unless I missed it I don't see the shelter, antennas or lines. So you have all those, plus the install of the equipment install inside the shelter (unless it shipped installed), programming and commissioning of the equipment, backhaul integration (fiber/MW/T1/whatever), master site integration and testing.

You must be a project manager..."tower is up, go put the site on the air". :p
 

Dman674

Newbie
Joined
Nov 23, 2019
Messages
2
Location
Portsmouth,VA
Unless I missed it I don't see the shelter, antennas or lines. So you have all those, plus the install of the equipment install inside the shelter (unless it shipped installed), programming and commissioning of the equipment, backhaul integration (fiber/MW/T1/whatever), master site integration and testing.

You must be a project manager..."tower is up, go put the site on the air". :p
You are correct
 

LeSueurC

IBEW Local 50
Premium Subscriber
Joined
Nov 6, 2014
Messages
1,213
Location
James City Co, VA
Unless I missed it I don't see the shelter, antennas or lines. So you have all those, plus the install of the equipment install inside the shelter (unless it shipped installed), programming and commissioning of the equipment, backhaul integration (fiber/MW/T1/whatever), master site integration and testing.

You must be a project manager..."tower is up, go put the site on the air". :p
I meant just the tower install. I didn’t mean all the terminations
 

LeSueurC

IBEW Local 50
Premium Subscriber
Joined
Nov 6, 2014
Messages
1,213
Location
James City Co, VA
Sounds like Portsmouth has followed many area FD radio practices when calling dispatch it’s no longer “Engine x to dispatch.” Now it’s “Engine x Portsmouth.”
 

K4APR

Member
Joined
Apr 18, 2003
Messages
1,028
Location
Chesapeake, VA.
Matt at the radio shop has already started the installs. We should be going live soon! I will ask and let everyone know.

If you see Matt again, tell him Jason Rausch said hi. I worked with him at Tidewater Communications almost twelve years ago. I'm with Motorola Solutions in Yorktown, now.
 

LeSueurC

IBEW Local 50
Premium Subscriber
Joined
Nov 6, 2014
Messages
1,213
Location
James City Co, VA
I know the tower in Churchland has the antennas a top it, didn’t see any lights on it, haven’t rode past it to see if the shelter is complete
Looks like the shelter may be close to being complete, the antennas are atop the tower now. Still no light flashing in the top tho
 