I caught a few Data Bursts from the new system, so apparently the initial testing has begun.....
The ducting conditions were not optimal, so I caught them for a short time on my PRO-83...... Will most likely be making a trip or two up that way as I have to go to Jackson for some training seminars with CN/IC.....
And on the Rail side of things.... I have utmost respect for the techs, and engineers that install the mobiles in the locos.... And those directional ants are interesting to say the least.

The ducting conditions were not optimal, so I caught them for a short time on my PRO-83...... Will most likely be making a trip or two up that way as I have to go to Jackson for some training seminars with CN/IC.....
And on the Rail side of things.... I have utmost respect for the techs, and engineers that install the mobiles in the locos.... And those directional ants are interesting to say the least.