Starting today I believe, UP is combining multiple main track authorities into one form, known as the Track Authority Form. They rolled track permits, track warrants and track & time into one form carried by MoW and train crews.
So, when you start hearing "X box 8...." etc on CTC tracks or the such, it does not mean that its gone to TWC. Its just how the form is done. Basically it looks like a track warrant they always used, but with some modifications.
If I heard right, you will basically hear in CTC territory a Box 8 given to MoW folks, or trains in where a track permit would be given to (going against the current of traffic).
Just about everything else is the same.
So, when you start hearing "X box 8...." etc on CTC tracks or the such, it does not mean that its gone to TWC. Its just how the form is done. Basically it looks like a track warrant they always used, but with some modifications.
If I heard right, you will basically hear in CTC territory a Box 8 given to MoW folks, or trains in where a track permit would be given to (going against the current of traffic).
Just about everything else is the same.