The bond vote passed, with 66%.
Design is expected to take 1 year, construction 2 years.
They hope to move in by 2012.
Dispatch and 911 will move into a separate EOC building. There's a possibility this facility will also house state EOC operations as well. Should be quite the state of the art facility in terms of equipment for dispatch.