GlacierClipper
Member
More Infor: http://www.fbodaily.com/archive/2007/08-August/05-Aug-2007/FBO-01361752.htm
We have a requirement for upgrade of the installation base radio system (BRS). Fort Riley is looking for sources with capability to upgrade its M/A-COM ProVoice ?, trunking radio system to an APCO 25 compliant Trunking radio system consisting of a p rimary site and 2 new sites. The Primary site currently consists of 7 transmitters and will be expanded to a total of 14 operating in the 406 -420 M bandwidth. The Grant Ridge site will be a new 3 transmitter site utilizing an existing tower and communicat ions hut. The Range 54 site will be a new 3 transmitter site utilizing an existing communications hut but requires the erection of a 100 transmitter tower. Required APCOP25 Feature Support System
We have a requirement for upgrade of the installation base radio system (BRS). Fort Riley is looking for sources with capability to upgrade its M/A-COM ProVoice ?, trunking radio system to an APCO 25 compliant Trunking radio system consisting of a p rimary site and 2 new sites. The Primary site currently consists of 7 transmitters and will be expanded to a total of 14 operating in the 406 -420 M bandwidth. The Grant Ridge site will be a new 3 transmitter site utilizing an existing tower and communicat ions hut. The Range 54 site will be a new 3 transmitter site utilizing an existing communications hut but requires the erection of a 100 transmitter tower. Required APCOP25 Feature Support System