Northampton County 800 MHz P25 Phase II TRS

Status
Not open for further replies.

GTR8000

NY/NJ Database Guy
Database Admin
Joined
Oct 4, 2007
Messages
16,033
Location
BEE00
The county took over the Bethlehem P25 Phase I 3 subsite, 6 channel simulcast system (2AF) in 2019, and is now in the process of expanding the system in stages to ultimately become a 12 subsite, 10 channel 800 MHz Phase II countywide system, with a planned completion date of end of 2026.

- The first stage (June 2024) will be to create a new 4 subsite, 6 channel simulcast cell that will operate alongside the existing Bethlehem cell, using a different set of frequencies

- The second stage (end of 2025) will be to add 5 additional subsites and 4 additional channels to the previously created cell, bringing the total to 9 subsites and 10 channels

- The final stage (end of 2026) will be to reconfigure the original 3 Bethlehem subsites so that they use the same 10 channels as the other cell, becoming a single 12 subsite, 10 channel countywide cell
 

NCFA

Member
Feed Provider
Joined
Oct 12, 2022
Messages
13
Location
Plainfield Township, Pa
I heard south pd units today on talk group 11007 on Bethlehem's Simulcast Site, audio is on the calls platform. By the time I programmed my scanner and went down that way they went offline. Not sure what kind of testing they are doing with the South units. Audio time starts around 1300hrs.

 