Which agency/company do you work for on the project? Would I be correct in assuming you are a comdex contractor for the coverage testing?
Incorrect...
Interesting... is this what you assumed or were actually told? Might want to go back and ask the "systems engineers" for better information.
=====================================================================
1st) I was contracted as a neutral 3rd party thru R.C.C. and a temp agency. I had just earned a degree in electronics and communications engineering.
2nd) no- its NOT incorrect. That was the information handed out to us. That was the purpose of 3 weeks of testing- to test the 6 towers. Believe me, they made us keep track of these things. I do believe your wrong.
3rd- Yes I'm sure that the Motorola Commdex Systems engineers, test engineers, and systems designers are pretty sure of what they know. Since, they were working with it.
============================================================================
@KevinC/grem467
I asked the same thing if they had grounded it right, and if the tower had been properly insulated.
I was assured that they had taken every precaution they could, and that the lightning strike had more juice to it then the designers had anticipated in that one strike. Things like that happen right?
I mean, you can tell me that EVERY lightning strike is exactly the same as the one before it and after it?
That means that there isn't a deviation in electricity ever?
IS that what your saying?
I'll ask one of the systems engineers if I can have some pictures and if I can post them. IF he says yes- I'll have them up on tues, or wed.