Also a note from UPMan on charging while in the radio:
"For SDS100, 100% charge current is 700 mA. Constant voltage is 4.2V.
So, charges at 700mA until battery voltage reaches 4.2V, then constant voltage of 4.2V until charge current < 100mA (then considered fully charged)."
Houk
Sent from my Moto G (4) using Tapatalk
"For SDS100, 100% charge current is 700 mA. Constant voltage is 4.2V.
So, charges at 700mA until battery voltage reaches 4.2V, then constant voltage of 4.2V until charge current < 100mA (then considered fully charged)."
Houk
Sent from my Moto G (4) using Tapatalk