DJ11DLN
Member
We (southwest) don't yet have a timeline for any actual reprogramming. As far as it has gone is to determine what radios are EOL and won't be allowed authorization on the P25 system. But since that's currently being reconfirmed, I hope we'll be hearing soon when everything will have to be brought in and updated. And so far no word on a deadline when the EOL stuff will need to be replaced by, but I'm sure we'll be hearing this soon as it is a blood-in-the-water situation for the vendors.
I think MILF covered this already but what I'm being told is that the 2 systems will run side-by-side with patching as necessary to maintain continuity until everything is done and then with the full cut-over, once it's verified to be working properly, the Mot2 system will be taken offline, in stages as zones are finished. Take that with a grain of salt or 3, there's been some conflicting info floating around so just passing this along for what it's worth.:wink:
I think MILF covered this already but what I'm being told is that the 2 systems will run side-by-side with patching as necessary to maintain continuity until everything is done and then with the full cut-over, once it's verified to be working properly, the Mot2 system will be taken offline, in stages as zones are finished. Take that with a grain of salt or 3, there's been some conflicting info floating around so just passing this along for what it's worth.:wink: