nd5y
Member
Application for 5 site 6 channel P25 phase II simulcast system.
Yeah it went dead on the conventional channelsStillwater will be testing this system around Stillwater with police and fire units. On June 24 2025 they plan to go live for Stillwater only. The others sits are about 7 months out of using the statement. Stillwater may encpt the their system since they are the site controller for the system. Happy scanning.
Add them toThere are numerous 4xx TGs showing up on that site, encrypted.