I have a question that someone here might be able to answer. According to the last Viper newsletter (June-December 2019) when the system is fully built out there will be 241 sites. As of Dec 2019 there where 227 sites with four under construction: Besides the four mentioned in the newsletter: Benson (Johnston Ct), Anson 911 (Anson Ct), Ford Rd (Watauga Ct), and Charlotte (Mecklenburg Ct), does anyone know where the other ten remaining sites to finish the build will be located? Under the original plan, the build-out was supposed to be done in phases with sites here in the west (aka mountains being the last to be built. I assume then that some of the remaining sites will be here in the west end? Just curious what is left to fully implement the system.